JASO Elevation Systems
| Intranet

Jaso News

Move It Magazine features JASO cranes at the Chacao Bridge on its cover

JASO Tower Cranes en Move It

13 / 11 / 2026

Move It Magazine dedicates a feature in its April–May 2026 issue to the role of JASO cranes in the construction of the Chacao Bridge in Chile, one of the most ambitious and demanding infrastructure projects currently under construction in South America. The project is also featured on the cover of this issue of the magazine.

Under the title “JASO Cranes conquer the Chacao Canal”, the article highlights the work our cranes have been carrying out on the project since 2019 and the significant technical and environmental challenges of operating in the Chacao Channel, including torrential rainfall, strong currents, seismic activity and winds of up to 120 km/h.

In collaboration with our distributor in Chile, Heavy Duty, JASO has developed specific solutions for the different construction phases of the central pier and pylon of what will become South America’s longest suspension bridge upon completion. Five JASO cranes are currently involved in the project: two J360.24 Low Top cranes, two J380PA Luffing cranes and one J80PA Luffing crane.

A project that demonstrates how, in some of the most challenging environments, engineering, experience and planning are just as important as the cranes themselves.

Discover the full feature published by Move It Magazine below.