{"id":5098,"date":"2024-11-28T09:44:53","date_gmt":"2024-11-28T09:44:53","guid":{"rendered":"https:\/\/jaso.com\/tower\/?p=5098"},"modified":"2024-11-28T09:54:42","modified_gmt":"2024-11-28T09:54:42","slug":"jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line","status":"publish","type":"post","link":"https:\/\/jaso.com\/tower\/en\/media\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/","title":{"rendered":"JASO Tower Cranes Drives the Construction of the Zumelegui Viaduct on the Elorrio High-Speed Rail Line"},"content":{"rendered":"\n<h5 class=\"wp-block-heading\">Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.<\/h5>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-1024x575.jpg\" alt=\"\" class=\"wp-image-5113\" srcset=\"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-1024x575.jpg 1024w, https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-300x169.jpg 300w, https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-768x431.jpg 768w, https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-1536x863.jpg 1536w, https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/Viaducto-Zumelegui-4-1-2048x1151.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>For the Elorrio-Elorrio high-speed section in Biscay, awarded by ADIF to Sacyr Ingenier\u00eda e Infraestructuras and Cavosa, in a joint venture with Mariezcurrena, a robust and versatile solution was required. This section is characterized by complex infrastructure, including viaducts and tunnels, in a highly demanding technical environment. Specifically, the 481-meter-long Zumelegui Viaduct required a crane capable of meeting the challenges of height and precision.<\/p>\n\n\n\n<p>To address these challenges, four <strong>J300 <\/strong>cranes from our <strong><a href=\"https:\/\/jaso.com\/tower\/en\/crane_category\/high-top-en\/\">High To<\/a><a href=\"https:\/\/jaso.com\/tower\/en\/crane_category\/high-top-en\/\" target=\"_blank\" rel=\"noreferrer noopener\">p<\/a><\/strong> range were selected. These cranes were initially installed at a height of <strong>50 meters<\/strong> using TRD36 mast sections (<strong>3.6m x 3.6m<\/strong>). Later, they climbed to a final height of <strong>93.4 meters<\/strong> using a climbing cage and by transitioning from TRD36 sections to TR20 and TN20 sections (both <strong>2.0m x 2.0m<\/strong>).<\/p>\n\n\n\n<p>This flexible climbing capability has ensured uninterrupted operation at every stage of the Zumelegui Viaduct\u2019s construction, guaranteeing efficiency and safety throughout the process.<\/p>\n\n\n\n<p>Sacyr chose JASO Tower Cranes not only for the excellent balance of quality and price of our equipment, but also for our hands-on and specialized after-sales service. This collaboration ensured that our cranes operated at peak efficiency, contributing to meeting project deadlines and quality standards.<\/p>\n\n\n\n<p>With the Zumelegui Viaduct now in its final phase, JASO Tower Cranes celebrates yet another milestone in high-speed rail infrastructure construction. This success further consolidates our position in the market as a provider of innovative and efficient solutions. The precision and robustness of the J300 cranes have been instrumental in the success of this project, representing a significant advancement in the transportation infrastructure of the Basque Country.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Avanzamos en la construcci\u00f3n del tramo de alta velocidad Elorrio-Elorrio (Vizcaya, Espa\u00f1a)\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/ZSaAE0UKXjw?start=4&#038;feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe> \n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n. For the Elorrio-Elorrio high-speed section in Biscay, awarded by ADIF to Sacyr Ingenier\u00eda e Infraestructuras and Cavosa, in a joint venture with Mariezcurrena, a robust and versatile solution was required. This section is characterized [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":5139,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15,47],"tags":[],"class_list":["post-5098","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media","category-projects"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>We Support Building the Zumelegui Viaduct on the Elorrio Rail Line<\/title>\n<meta name=\"description\" content=\"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"We Support Building the Zumelegui Viaduct on the Elorrio Rail Line\" \/>\n<meta property=\"og:description\" content=\"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/\" \/>\n<meta property=\"og:site_name\" content=\"Tower crane manufacturer - JASO Tower Cranes\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-28T09:44:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-28T09:54:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"585\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"andreagarcia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"andreagarcia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/\"},\"author\":{\"name\":\"andreagarcia\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#\\\/schema\\\/person\\\/86b168fa8249ffa340d725f72acfc793\"},\"headline\":\"JASO Tower Cranes Drives the Construction of the Zumelegui Viaduct on the Elorrio High-Speed Rail Line\",\"datePublished\":\"2024-11-28T09:44:53+00:00\",\"dateModified\":\"2024-11-28T09:54:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/\"},\"wordCount\":313,\"publisher\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/destacado-sacyr.jpg\",\"articleSection\":[\"Media\",\"Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/\",\"url\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/\",\"name\":\"We Support Building the Zumelegui Viaduct on the Elorrio Rail Line\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/destacado-sacyr.jpg\",\"datePublished\":\"2024-11-28T09:44:53+00:00\",\"dateModified\":\"2024-11-28T09:54:42+00:00\",\"description\":\"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#primaryimage\",\"url\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/destacado-sacyr.jpg\",\"contentUrl\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/destacado-sacyr.jpg\",\"width\":1000,\"height\":585},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/highlights\\\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/jaso.com\\\/tower\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"JASO Tower Cranes Drives the Construction of the Zumelegui Viaduct on the Elorrio High-Speed Rail Line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#website\",\"url\":\"https:\\\/\\\/jaso.com\\\/tower\\\/\",\"name\":\"JASO Tower Cranes - Fabricantes de gr\u00faas torre\",\"description\":\"We build the cranes that build the world. We are a worldwide benchmark manufacturer of tower cranes. We offer an all-round tower crane solution.\",\"publisher\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#organization\"},\"alternateName\":\"JASO Tower Cranes\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/jaso.com\\\/tower\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#organization\",\"name\":\"JASO Tower Cranes\",\"alternateName\":\"JASO\",\"url\":\"https:\\\/\\\/jaso.com\\\/tower\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/jaso_torre.png\",\"contentUrl\":\"https:\\\/\\\/jaso.com\\\/tower\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/jaso_torre.png\",\"width\":1200,\"height\":630,\"caption\":\"JASO Tower Cranes\"},\"image\":{\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/jaso.com\\\/tower\\\/#\\\/schema\\\/person\\\/86b168fa8249ffa340d725f72acfc793\",\"name\":\"andreagarcia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g\",\"caption\":\"andreagarcia\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"We Support Building the Zumelegui Viaduct on the Elorrio Rail Line","description":"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/","og_locale":"en_US","og_type":"article","og_title":"We Support Building the Zumelegui Viaduct on the Elorrio Rail Line","og_description":"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.","og_url":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/","og_site_name":"Tower crane manufacturer - JASO Tower Cranes","article_published_time":"2024-11-28T09:44:53+00:00","article_modified_time":"2024-11-28T09:54:42+00:00","og_image":[{"width":1000,"height":585,"url":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg","type":"image\/jpeg"}],"author":"andreagarcia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"andreagarcia","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#article","isPartOf":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/"},"author":{"name":"andreagarcia","@id":"https:\/\/jaso.com\/tower\/#\/schema\/person\/86b168fa8249ffa340d725f72acfc793"},"headline":"JASO Tower Cranes Drives the Construction of the Zumelegui Viaduct on the Elorrio High-Speed Rail Line","datePublished":"2024-11-28T09:44:53+00:00","dateModified":"2024-11-28T09:54:42+00:00","mainEntityOfPage":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/"},"wordCount":313,"publisher":{"@id":"https:\/\/jaso.com\/tower\/#organization"},"image":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#primaryimage"},"thumbnailUrl":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg","articleSection":["Media","Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/","url":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/","name":"We Support Building the Zumelegui Viaduct on the Elorrio Rail Line","isPartOf":{"@id":"https:\/\/jaso.com\/tower\/#website"},"primaryImageOfPage":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#primaryimage"},"image":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#primaryimage"},"thumbnailUrl":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg","datePublished":"2024-11-28T09:44:53+00:00","dateModified":"2024-11-28T09:54:42+00:00","description":"Four J300 cranes have played a crucial role in the high-speed rail project that will connect Vitoria, Bilbao, and San Sebasti\u00e1n.","breadcrumb":{"@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#primaryimage","url":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg","contentUrl":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2024\/11\/destacado-sacyr.jpg","width":1000,"height":585},{"@type":"BreadcrumbList","@id":"https:\/\/jaso.com\/tower\/en\/highlights\/jaso-tower-cranes-drives-the-construction-of-the-zumelegui-viaduct-on-the-elorrio-high-speed-rail-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/jaso.com\/tower\/en\/"},{"@type":"ListItem","position":2,"name":"JASO Tower Cranes Drives the Construction of the Zumelegui Viaduct on the Elorrio High-Speed Rail Line"}]},{"@type":"WebSite","@id":"https:\/\/jaso.com\/tower\/#website","url":"https:\/\/jaso.com\/tower\/","name":"JASO Tower Cranes - Fabricantes de gr\u00faas torre","description":"We build the cranes that build the world. We are a worldwide benchmark manufacturer of tower cranes. We offer an all-round tower crane solution.","publisher":{"@id":"https:\/\/jaso.com\/tower\/#organization"},"alternateName":"JASO Tower Cranes","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/jaso.com\/tower\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/jaso.com\/tower\/#organization","name":"JASO Tower Cranes","alternateName":"JASO","url":"https:\/\/jaso.com\/tower\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jaso.com\/tower\/#\/schema\/logo\/image\/","url":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2022\/10\/jaso_torre.png","contentUrl":"https:\/\/jaso.com\/tower\/wp-content\/uploads\/2022\/10\/jaso_torre.png","width":1200,"height":630,"caption":"JASO Tower Cranes"},"image":{"@id":"https:\/\/jaso.com\/tower\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/jaso.com\/tower\/#\/schema\/person\/86b168fa8249ffa340d725f72acfc793","name":"andreagarcia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65e4f45bdf3350aa3b55bcce6aaf9da6776ee2e9f9a05ef1d373564e4b3504b4?s=96&d=mm&r=g","caption":"andreagarcia"}}]}},"_links":{"self":[{"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/posts\/5098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/comments?post=5098"}],"version-history":[{"count":7,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/posts\/5098\/revisions"}],"predecessor-version":[{"id":5147,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/posts\/5098\/revisions\/5147"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/media\/5139"}],"wp:attachment":[{"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/media?parent=5098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/categories?post=5098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jaso.com\/tower\/en\/wp-json\/wp\/v2\/tags?post=5098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}